An ICF building built to achieve near Passivhaus standards.  This project involved the demolition of an existing house and the redevelopment of a large house built with insulated blocks and a reinforced concrete core, with an external render finish.  The building was tested for air tightness to Passivhaus standards and achieved 0.68.